Free Shipping
922 watching

Behind Schedule – Old West – Jack Sorenson – Poster – Canvas Print – Wooden Hanging Scroll Frame

$19.95

Behind Schedule – Old West – Jack Sorenson – Poster – Canvas Print – Wooden Hanging Scroll Frame

Poster:

  • Printed with Dye/Pigment Reactive Ink
  • On archival matte paper
  • Shipped in heavy duty poster tube
  • Heavy weight (230 gsm), thick base (9.5 mil), and an instant-dry coating that resists fingerprints and smudging.
  • Canvas: Gallery quality canvas print displays vibrant artwork that is built to last. Printed with HP Latex Inks that are fade resistant. Inks are water based and solvent free so rest assured there are no harsh chemicals in your home. Assembled with 3/4″ thick wood frame and glued wood core stretcher bars. All canvas prints are wrapped and shipped in fitted packaging

    • Ready To Hang – Mounting hardware comes attached.
    • Leveling Bumpers Included – For wall protection.
    • Semi-Gloss Print – Increased vibrancy of artwork.
    • Beveled Wood Stretch Bars – Make frame less noticeable on front of canvas.
    • Industrial Strength Staples – Ensure a tight fit that is sure to last.

320 people have this in their carts right now.

guarantee purchase

Shipping options:

Item Location: Davison, MI 48423


SAFE & SECURE CHECKOUT:

Pay with the world’s most popular and secure payment methods Paypal.

Behind Schedule - Old West - Jack Sorenson – Poster - Canvas Print - Wooden Hanging Scroll Frame